Thursday, August 15, 2013

Thursday, 15 August Day 4

Today brought on more paneling installation, painting of two ceilings, polyurethane trim and a few pieces of trim installed. We added some stone to her path from her steps to the road. Cindy worked in the office today putting the Settlements newsletter together.

Joe and John were doing some painting today.

Charlie putting hammering in the trim nails into the paneling. The old oak boards in the walls make driving in the nails very difficult.

Joe and Gary putting down the new stones on the path way.

The cats checking out the new stones put down on the path.


Gary brushing on the polyurethane on the trim.

Joe flexing his muscles tamping down the new stone.

Charlie and Inez the homeowner/d



Joe, Gary, John and Charlie cutting and installing the paneling.


Joe, John and Gary having fun posing for the camera.

Having supper in the dining hall,

John looking relaxed.

Hope United Methodist Church where we had our closing ceremony today.




The local ice cream stop in the evening  

No comments:

Post a Comment